Connect with us

JAMMU & KASHMIR

Critically overloaded Receiving Stations to be augmented in phased manner : Asiea Naqash | KNO

‘Power supply to improve with commissioning of 400 KV Grid Station in North Kashmir, 3 installations being upgraded in Kokernag area’

Published

on

kno news

JAMMU, FEBRUARY 10 (KNO) : The Government on Saturday said that it was making concerted efforts to reduce scheduled and unscheduled power cuts by augmenting in a phased manner the critically overloaded Receiving Stations in the State. Replying to a Calling Attention Notice by Mubarak Gul in the Legislative Assembly, Minister of State for Power, Asiea Naqash said some Receiving Stations are critically overloaded, which necessitate unscheduled cuts at Sub-Transmission levels. “Such critically overloaded Receiving Stations are being augmented as per the load requirement on priority in a phased manner to reduce the unscheduled cuts,” she said. The Minister further informed the House that unrestricted demand (peak power) in Kashmir valley, at present, is 1900 MW of which around 1190 MW is being met while as rest is curtailed by enforcing curtailment schedule. She said Peak Load of around 1190 MW is presently being served during morning and evening hours, when the aggregate registered load on the system comprises of predominantly domestic and essential loads having load agreements of 700 MW. “This indicates that major portion of the domestic consumers use load in excess of their agreement load” she added. She said currently there are 45 hours per week average curtailment in metered areas and 63 hours per week curtailment in non-metered areas. Asiea informed the house that the load shedding is being regulated and disciplined with multi-level monitoring, even as the local generation in Kashmir Valley drastically reduces in winter due to decrease in water availability. She said the scheduled / unscheduled cuts are restored to provide power supply as per availability in order to maintain the grid discipline. She said in addition, system constraints at Transmission level also necessitate unscheduled cuts while efforts are always made to restrict these cuts to minimum time durations by employing rotational procedure. The Minister further informed that the scheduled cuts will get reduced considerably after new 400 KV Grid Station would be made operational in North Kashmir - which is being commissioned shortly. She further said that consumer meters are being installed in all divisions to enforce judicious use of power, keep check on the illegal connections and excessive use of load. She added that enforcement teams/squads, already established at all levels, are conducting rigorous inspections across the length and breadth of valley to improve the enforcement. Meanwhile, while responding to another Calling Attention Notice by Legislator A R Rather, the Minster said government has sanctioned augmentation of three major Receiving Stations to improve power supply in Kokernag area. The Minister said to mitigate the problem of overloading in the area, the augmentation projects have been sanctioned for from 6.3 MVA Hiller Receiving Station, 10+6.3 MVA Kokernag Receiving Station and 6.3 MVA Dandipora Receiving Station. She said the Government would also formulate a DPR for the augmentation of 50 MVA Grid Station, Buchoo (Lissar) to 100 MVA to further improve power scenario in the area. She said all these Receiving Stations are getting overloaded with the onset of winter as the unrestricted load demand of the consumers fed from these installations exceeds their handling capacity, owing to which additional cuts are being implemented in addition to curtailment schedule. She said during winters, consumers use power in excess of the agreement load, thereby overloading the system, particularly the 11 KV feeding lines, Receiving stations, 33 KV feeding line and in some cases Grid station also. Of these Receiving stations have been sanctioned under various Centrally Sponsored Schemes and once above two augmentations are completed, the power supply to the area shall improve significantly.(KNO)

Trending

TOP STORIES2 hours ago

Rescheduling of LS Polls in Anantnag-Rajouri Parliamentary; ECI seeks report from Chief Secy, CEO JK | KNO

TOP STORIES2 hours ago

2 dozen houses develop cracks as 5-km Ramban-Gool road caves in at Pernote | KNO

TOP STORIES4 hours ago

CS reviews take-up of Vishwakarma & RAMP schemes in J&K | KNO

TOP STORIES4 hours ago

Delegation of Sikh Coordination Committee calls on LG Sinha | KNO

TOP STORIES4 hours ago

Sgr admin issues advisory in view of inclement weather forecast | KNO

TOP STORIES4 hours ago

Army trains VDCs in weapon handling in J&K's Mendhar | KNO

TOP STORIES4 hours ago

Potholed road in Pantha Chowk poses risk to commuters | KNO

TOP STORIES4 hours ago

BJP has announced support to Mehbooba Mufti, alleges Omar Abdullah | KNO

TOP STORIES4 hours ago

Sonamarg welcomes record-breaking 1,62,281 tourists in three months | KNO

TOP STORIES4 hours ago

Sgr Boat Tragedy” No traces of missing persons as operation enters 10th day | KNO

TOP STORIES4 hours ago

Civilian injured in Sopore encounter, Ops on | KNO

TOP STORIES4 hours ago

Construction of flyovers: Traffic plying on just 5.5 meter road surface on busiest highway in Sgr | KNO

TOP STORIES4 hours ago

Ladakh Leads India in Stock Market Interest with Highest Demat Accounts | KNO

TOP STORIES4 hours ago

Class 8th results: ‘SCERT displays one more show of mockery’ | KNO

TOP STORIES4 hours ago

8,652 dog bite cases reported to ARC SMHS in last one year | KNO

TOP STORIES4 hours ago

In Jammu LS seat, border residents to play crucial role | KNO

TOP STORIES4 hours ago

Jammu LS seat set for big battle today as second phase begins | KNO

Copyright © 2021